{"id":19,"date":"2021-03-08T10:20:00","date_gmt":"2021-03-08T09:20:00","guid":{"rendered":"https:\/\/fond-nek.hr\/?page_id=19"},"modified":"2025-05-15T10:32:13","modified_gmt":"2025-05-15T08:32:13","slug":"zbrinjavanje-radioaktivnog-otpada","status":"publish","type":"page","link":"https:\/\/www.fond-nek.hr\/en\/zbrinjavanje-radioaktivnog-otpada\/","title":{"rendered":"Radioactive Waste Management"},"content":{"rendered":"<p class=\"wp-block-paragraph\">The Republic of Croatia has an obligation to dispose of:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Institutional radioactive waste (IRW)<\/strong>&nbsp;\u2013 it is a radioactive waste which is the product of application of radioactive materials and sources of ionizing radiation in research, medicine, science industry, etc.;<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full is-resized\" style=\"margin-top:20px;margin-bottom:20px\"><img fetchpriority=\"high\" decoding=\"async\" width=\"730\" height=\"525\" src=\"https:\/\/www.fond-nek.hr\/wp-content\/uploads\/2025\/04\/institucionalni-radioaktivni-otpad-IRAO.webp\" alt=\"Dijagram s \u010detiri dijela oko sredi\u0161njeg kruga s oznakom &quot;IRAO Institucionalni Radioaktivni Otpad.&quot; Odjeljci uklju\u010duju ikone i rije\u010di: Medicina (medicinski kri\u017e), Znanost (atom), Industrija (tvornica) i Istra\u017eivanja (laboratorijska oprema).\" class=\"wp-image-37134\" style=\"width:480px\" srcset=\"https:\/\/www.fond-nek.hr\/wp-content\/uploads\/2025\/04\/institucionalni-radioaktivni-otpad-IRAO.webp 730w, https:\/\/www.fond-nek.hr\/wp-content\/uploads\/2025\/04\/institucionalni-radioaktivni-otpad-IRAO-300x216.webp 300w, https:\/\/www.fond-nek.hr\/wp-content\/uploads\/2025\/04\/institucionalni-radioaktivni-otpad-IRAO-18x12.webp 18w\" sizes=\"(max-width: 730px) 100vw, 730px\" \/><\/figure>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Radioactive waste (RW) from the Kr\u0161ko Nuclear Power Plant<\/strong>&nbsp;\u2013 this is half of the radioactive waste and spent nuclear fuel generated by the operation and later decommissioning of the nuclear power plant.<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full is-resized\" style=\"margin-top:20px;margin-bottom:20px\"><img decoding=\"async\" width=\"784\" height=\"520\" src=\"https:\/\/www.fond-nek.hr\/wp-content\/uploads\/2025\/04\/radioaktivni-otpad-RAO-iz-Nuklearne-elektrane-Krsko.webp\" alt=\"Infografika sa sredi\u0161njim krugom s oznakom &quot;RAO&quot; koji dijeli radioaktivni otpad u kategorije: vrlo niska, niska, srednja i visoka. Svaki odjeljak opisuje vrstu otpada i njegov utjecaj na okoli\u0161 i javno zdravlje, napisano na hrvatskom jeziku.\" class=\"wp-image-37135\" style=\"width:480px\" srcset=\"https:\/\/www.fond-nek.hr\/wp-content\/uploads\/2025\/04\/radioaktivni-otpad-RAO-iz-Nuklearne-elektrane-Krsko.webp 784w, https:\/\/www.fond-nek.hr\/wp-content\/uploads\/2025\/04\/radioaktivni-otpad-RAO-iz-Nuklearne-elektrane-Krsko-300x199.webp 300w, https:\/\/www.fond-nek.hr\/wp-content\/uploads\/2025\/04\/radioaktivni-otpad-RAO-iz-Nuklearne-elektrane-Krsko-768x509.webp 768w, https:\/\/www.fond-nek.hr\/wp-content\/uploads\/2025\/04\/radioaktivni-otpad-RAO-iz-Nuklearne-elektrane-Krsko-18x12.webp 18w\" sizes=\"(max-width: 784px) 100vw, 784px\" \/><\/figure>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Naturally-occurring radioactive materials (NORM) and NORM residues<\/strong> \u2013 this is low-radioactive waste material that results from the exploitation, refining and use of mineral resources, oil and gas that naturally contain higher concentrations of radionuclides. Although they are not considered radioactive waste, their management is regulated by the regulation on radiological and nuclear safety, which primarily provides for storage, reuse or recycling of residues. <strong>Remediation of locations with elevated concentrations of naturally radioactive materials is not the responsibility of the Fund, but of the owner of the location and the local self-government unit, under the supervision of competent authorities.<\/strong><\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:20px\">Pursuant to the Radiological and Nuclear Safety Act (official gazette \u201cNarodne novine\u201d, no.&nbsp;<a href=\"https:\/\/narodne-novine.nn.hr\/clanci\/sluzbeni\/2013_11_141_3012.html\">141\/13<\/a>,&nbsp;<a href=\"https:\/\/narodne-novine.nn.hr\/clanci\/sluzbeni\/2015_04_39_803.html\">39\/15<\/a>,&nbsp;<a href=\"https:\/\/narodne-novine.nn.hr\/clanci\/sluzbeni\/2017_12_130_2988.html\">130\/17<\/a>,&nbsp;<a href=\"https:\/\/narodne-novine.nn.hr\/clanci\/sluzbeni\/2018_12_118_2352.html\">118\/18<\/a>&nbsp;and&nbsp;<a href=\"https:\/\/narodne-novine.nn.hr\/clanci\/sluzbeni\/2022_02_21_226.html\">21\/22<\/a>), the Fund is required to establish and manage <a href=\"http:\/\/www.czrao.hr\">the RW Management Centre<\/a> in Croatia.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The EU Directive\u00a0has established a framework for the responsible and safe management of radioactive waste (RW) and spent nuclear fuel (SNF) <a href=\"https:\/\/eur-lex.europa.eu\/legal-content\/HR\/TXT\/PDF\/?uri=CELEX:32011L0070&amp;from=EN\">2011\/70\/EURATOM<\/a>. The Directive requires member states to establish competent and efficient national RW and SNF management systems, including national legislation and regulatory and organisational frameworks. Pursuant to the Directive, the Republic of Croatia is responsible for its share of RW and SNF and is therefore required to adopt a detailed national programme for the management of these types of waste. In October\u00a02014, pursuant to the <a href=\"https:\/\/www.zakon.hr\/z\/289\/Zakon-o-radiolo%25C5%25A1koj-i-nuklearnoj-sigurnosti\">Radiological and Nuclear Safety Act<\/a>, the Croatian Parliament adopted the Radioactive Waste, Disused Sources and Spent Nuclear Fuel Management <a href=\"https:\/\/narodne-novine.nn.hr\/clanci\/sluzbeni\/2014_10_125_2382.html\">Strategy<\/a> , which was the basis for the development of the <a href=\"https:\/\/civilna-zastita.gov.hr\/UserDocsImages\/dokumenti\/Radioloska%20i%20nuklearna%20sigurnost\/Nacionalni%20programi\/Nacionalni%20program%20provedbe%20Strategije%20zbrinjavanja%20radioaktivnog%20otpada%20iskoristenih%20izvora%20i%20istrosenog%20nuklearnog%20goriva.pdf\">National Programme for the Implementation of (Radioactive Waste, Disused Sources and Spent Nuclear Fuel Management) Strategy<\/a> for the period until 2025 with a view until 2060.<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-medium-font-size\">RW and SNF from the Kr\u0161ko NPP<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">By signing the <a href=\"https:\/\/narodne-novine.nn.hr\/clanci\/medunarodni\/2002_07_9_114.html\">Bilateral Agreement<\/a> and ratifying all international conventions, directives, etc., the Republic of Croatia, together with the Republic of Slovenia, undertook to decommission the Kr\u0161ko NPP and dispose of spent nuclear fuel and radioactive waste generated by the operation and decommissioning of the plant. Under the Agreement, Slovenia and Croatia mutually agreed to provide an effective joint solution for RW and SNF disposal, with equal funding from both sides. In the event that no agreement on a joint solution for RW and SNF disposal is reached by the end of the plant\u2019s normal lifespan (the year 2023, later 2043), the Republic of Slovenia and the Republic of Croatia shall complete the takeover of Kr\u0161ko NPP RW and SNF, in equal parts, no later than two years after that deadline and independently bear the costs of any disposal activities that are not of common interest.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The <a href=\"https:\/\/www.fond-nek.hr\/en\/zbrinjavanje-radioaktivnog-otpada\/program-razgradnje\/\">13th Session of the Intergovernmental Commission<\/a> for Monitoring the Implementation of the Bilateral Agreement concluded that a joint solution for LILW disposal would not be feasible. Consequently, Slovenia and Croatia shall, respectively, retrieve and remove one half of the low and intermediate level radioactive waste (LILW) from the Kr\u0161ko NPP site. At the 17th session of the Intergovernmental Commission held in October\u00a02023, the extension of the start of the removal\/takeover of LILW to the beginning of 2028 was approved, which is also envisaged by the Fourth Revision of the Kr\u0161ko NPP RW and SNF Disposal Program(me).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Republic of Croatia and the Republic of Slovenia have settled on long-term dry storage of SNF at the Kr\u0161ko NPP site and its subsequent disposal in a deep geological repository. SNF\u2019s dry storage facility began operations in 2023 and is projected to operate for 60\u00a0years after the power plant\u2019s shut down. As part of the Fourth Revision, the first proposal for a Research, Development and Demonstration Programme (RD&amp;D Programme) for the joint disposal of SNF and HLW in a deep geological repository in Croatia or Slovenia was prepared. To address this issue, certain initiatives have also explored the prospect of a common, multinational solution.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-medium-font-size\">Institutional RW<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">In addition to waste from the Kr\u0161ko NPP, the Republic of Croatia is required to store and dispose of institutional radioactive waste generated in medicine, industry, science, military sectors and through public use. Pursuant to the Law on Amendments to the Act on the Fund for Financing the Decommissioning of the Kr\u0161ko Nuclear Power Plant and the Disposal of NEK Radioactive Waste and Spent Nuclear Fuel (official gazette \u201cNarodne novine\u201d, no.\u00a021\/2022), the Fund, in addition to management of LILW and SNF from the Kr\u0161ko NPP, also performs the management of radioactive waste generated on the territory of the Republic of Croatia.<\/p>\n\n\n\n<div class=\"wp-block-group has-border-color is-layout-constrained wp-container-core-group-is-layout-b45d79e8 wp-block-group-is-layout-constrained\" style=\"border-color:#7bab28;border-width:3px;border-radius:10px;margin-top:20px;margin-bottom:20px;padding-top:20px;padding-right:30px;padding-bottom:20px;padding-left:30px\">\n<p class=\"wp-block-paragraph\">The Strategy and the National Programme have envisioned the development of RW and SNF disposal solutions. Under the National Programme, \u010cerkezovac is the preferred site for the new <a href=\"https:\/\/www.fond-nek.hr\/en\/zbrinjavanje-rao-ing\/uspostava-centra-za-zbrinjavanje-rao\/\">Radioactive Waste Management Centre<\/a> . The Centre will comprise a central storage facility for institutional radioactive waste as well as a long-term storage facility for one half of the operational low and intermediate level radioactive waste from the Kr\u0161ko NPP.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Read all about the establishment of the Centre on our <a href=\"http:\/\/www.czrao.hr\">Centre website<\/a>.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-large is-resized\" style=\"margin-top:20px;margin-bottom:20px\"><a href=\"https:\/\/czrao.hr\/\"><img decoding=\"async\" width=\"1024\" height=\"601\" src=\"https:\/\/www.fond-nek.hr\/wp-content\/uploads\/2025\/04\/czrao-web-1024x601.webp\" alt=\"Podijeljena slika s zelenim \u0161umskim krajolikom s lijeve strane i modernim skladi\u0161tem s kamionom s desne strane. Tekst na hrvatskom govori o Centru za gospodarenje radioaktivnim otpadom, s mogu\u0107nostima poput info centara i kviza za prijavu na bilten.\" class=\"wp-image-37133\" style=\"width:480px\" srcset=\"https:\/\/www.fond-nek.hr\/wp-content\/uploads\/2025\/04\/czrao-web-1024x601.webp 1024w, https:\/\/www.fond-nek.hr\/wp-content\/uploads\/2025\/04\/czrao-web-300x176.webp 300w, https:\/\/www.fond-nek.hr\/wp-content\/uploads\/2025\/04\/czrao-web-768x451.webp 768w, https:\/\/www.fond-nek.hr\/wp-content\/uploads\/2025\/04\/czrao-web-18x12.webp 18w, https:\/\/www.fond-nek.hr\/wp-content\/uploads\/2025\/04\/czrao-web.webp 1232w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Republika Hrvatska ima obvezu zbrinuti: Temeljem Zakona o radiolo\u0161koj i nuklearnoj sigurnosti (\u201eNarodne Novine\u201c br.&nbsp;141\/13,&nbsp;39\/15,&nbsp;130\/17,&nbsp;118\/18&nbsp;i&nbsp;21\/22), Fond ima obvezu osnovati i upravljati Centrom za zbrinjavanje RAO u Republici Hrvatskoj. Okvir za odgovorno i sigurno gospodarenje s radioaktivnim otpadom (RAO) i istro\u0161enim nuklearnim gorivom (ING) uspostavlja se EU direktivom 2011\/70\/EURATOM. Direktiva nala\u017ee uspostavu kompetentnih i efikasnih nacionalnih [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"wpai_generated_summary":"","iawp_total_views":2416,"wpai_meta_description":"","footnotes":""},"class_list":["post-19","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.fond-nek.hr\/en\/wp-json\/wp\/v2\/pages\/19","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.fond-nek.hr\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.fond-nek.hr\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.fond-nek.hr\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.fond-nek.hr\/en\/wp-json\/wp\/v2\/comments?post=19"}],"version-history":[{"count":11,"href":"https:\/\/www.fond-nek.hr\/en\/wp-json\/wp\/v2\/pages\/19\/revisions"}],"predecessor-version":[{"id":38294,"href":"https:\/\/www.fond-nek.hr\/en\/wp-json\/wp\/v2\/pages\/19\/revisions\/38294"}],"wp:attachment":[{"href":"https:\/\/www.fond-nek.hr\/en\/wp-json\/wp\/v2\/media?parent=19"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}