{"id":22780,"date":"2023-11-20T14:56:54","date_gmt":"2023-11-20T13:56:54","guid":{"rendered":"https:\/\/www.fond-nek.hr\/?p=22780"},"modified":"2023-11-20T14:56:57","modified_gmt":"2023-11-20T13:56:57","slug":"ne-krsko-pustena-u-pogon","status":"publish","type":"post","link":"https:\/\/www.fond-nek.hr\/en\/ne-krsko-pustena-u-pogon\/","title":{"rendered":"NE Kr\u0161ko pu\u0161tena u pogon"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Od petka Nuklearna elektrana Kr\u0161ko ponovno je pu\u0161tena u pogon.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Generator NE Kr\u0161ko sinkroniziran je s elektroenergetskom mre\u017eom 17. studenog.\u00a0<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Nakon neovisne kontrole aktivnosti, ovla\u0161tene organizacije Uprave Republike Slovenije za nuklearnu sigurnost (URSJV) dale su pozitivno mi\u0161ljenje za pu\u0161tanje u rad. NE Kr\u0161ko je poslala URSJV-u izvje\u0161\u0107e i popratne studije o provedenoj analizi nakon kvara i zaustave elektrane. URSJV je potvrdio da je NE Kr\u0161ko provela sve potrebne i o\u010dekivane mjere i time ispunila preduvjete za siguran rad.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Nuklearna sigurnost nije bila ugro\u017eena tijekom doga\u0111aja jer je curenje bilo u granicama koje dopu\u0161ta normalan rad elektrane. Nije bilo ispu\u0161tanja radionuklida u okoli\u0161. Svi sigurnosni sustavi bili su dostupni. Odaziv opreme i osoblja na doga\u0111aj bio je u skladu s projektnim osnovama i o\u010dekivanjima.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">U tjednima od zaustavljanja elektrane zaposlenici NEK-a, zajedno sa stru\u010dnim i pouzdanim partnerima, uspje\u0161no su odradili sve korektivne radove i elektrana ponovno proizvodi niskouglji\u010dnu i ekonomski prihvatljivu elektri\u010dnu energiju.<\/p>","protected":false},"excerpt":{"rendered":"<p>Generator NE Kr\u0161ko sinkroniziran je s elektroenergetskom mre\u017eom 17. studenog.<\/p>","protected":false},"author":4,"featured_media":15025,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"wpai_generated_summary":"","iawp_total_views":54,"wpai_meta_description":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-22780","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-vijesti"],"_links":{"self":[{"href":"https:\/\/www.fond-nek.hr\/en\/wp-json\/wp\/v2\/posts\/22780","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.fond-nek.hr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.fond-nek.hr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.fond-nek.hr\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.fond-nek.hr\/en\/wp-json\/wp\/v2\/comments?post=22780"}],"version-history":[{"count":1,"href":"https:\/\/www.fond-nek.hr\/en\/wp-json\/wp\/v2\/posts\/22780\/revisions"}],"predecessor-version":[{"id":22782,"href":"https:\/\/www.fond-nek.hr\/en\/wp-json\/wp\/v2\/posts\/22780\/revisions\/22782"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.fond-nek.hr\/en\/wp-json\/wp\/v2\/media\/15025"}],"wp:attachment":[{"href":"https:\/\/www.fond-nek.hr\/en\/wp-json\/wp\/v2\/media?parent=22780"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.fond-nek.hr\/en\/wp-json\/wp\/v2\/categories?post=22780"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.fond-nek.hr\/en\/wp-json\/wp\/v2\/tags?post=22780"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}