{"id":5717,"date":"2021-01-25T12:57:37","date_gmt":"2021-01-25T11:57:37","guid":{"rendered":"https:\/\/fond-nek.hr\/potpisan-ugovor-za-provedbu-istrazivackih-radova\/"},"modified":"2021-08-21T21:01:37","modified_gmt":"2021-08-21T19:01:37","slug":"potpisan-ugovor-za-provedbu-istrazivackih-radova","status":"publish","type":"post","link":"https:\/\/www.fond-nek.hr\/en\/potpisan-ugovor-za-provedbu-istrazivackih-radova\/","title":{"rendered":"Potpisan ugovor za provedbu istra\u017eiva\u010dkih radova"},"content":{"rendered":"<p class=\"wp-block-paragraph\"><a href=\"https:\/\/radioaktivniotpad.org\/wp-content\/uploads\/2021\/01\/shutterstock_1714078633m.jpg\"><\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ugovor za uslugu provedbe istra\u017eiva\u010dkih radova na planiranoj lokaciji Centra za zbrinjavanje radioaktivnog otpada na podru\u010dju \u010cerkezovca potpisan je 25. sije\u010dnja 2021. godine sa zajednicom ponuditelja koju \u010dine Geotehni\u010dki studio d.o.o., Geodetski fakultet Sveu\u010dili\u0161ta u Zagrebu i Rudarsko-geolo\u0161ko-naftni fakultet Sveu\u010dili\u0161ta u Zagrebu. Ugovor je potpisan po provedenom postupku javne nabave za Izradu dokumentacije i provedbu aktivnosti za isho\u0111enje dozvola za izgradnju Centra za zbrinjavanje radioaktivnog otpada \u2013 Grupa 1 poslova.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Nisko i srednje radioaktivni otpad, koji \u0107e se skladi\u0161titi u Centru za zbrinjavanje radioaktivnog otpada, u prvom redu potje\u010de iz NE Kr\u0161ko te u manjem obimu iz znanstveno-istra\u017eiva\u010dkih instituta, medicinskih ustanova i industrijskih postrojenja koja u svom redovitom radu koriste izvore ioniziraju\u0107ih zra\u010denja. Rije\u010d je o otpadu koji \u0107e se skladi\u0161ti isklju\u010divo u krutom stanju, dok plinoviti i teku\u0107i otpad ne\u0107e biti skladi\u0161teni na definiranoj lokaciji. Skladi\u0161ta radioaktivnog otpada u sklopu Centra planiraju se i razvijaju kao sigurni objekti koji ne smiju imati utjecaj na okoli\u0161 i ljude. Uz onemogu\u0107eno curenje ili zra\u010denje otpada zbog agregatnog stanja u kojem se nalazi, bilo koji oblik utjecaja na okoli\u0161 i ljude spre\u010dava i niz barijera kao \u0161to su \u010deli\u010dne ba\u010dve u koje se otpad pakira, armiranobetonski spremnici u koje se ba\u010dve pakiraju i zapunjavaju betonom te u kona\u010dnici i sama protupotresno projektirana armiranobetonska gra\u0111evina.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Osnovna svrha predvi\u0111enih istra\u017eivanja je stjecanje potpunog i preciznog uvida u geolo\u0161ki sastav i gra\u0111u terena prostora lokacije predvi\u0111ene za izgradnju Centra. Istra\u017eivanja \u0107e omogu\u0107iti vrednovanje i karakterizaciju predmetne lokacije za smje\u0161taj Centra, zatim projektiranje gra\u0111evina\/postrojenja za skladi\u0161tenje radioaktivnog otpada i potrebnih infrastrukturnih objekata te dati sve podatke potrebne za izradu studije utjecaja na okoli\u0161 i provedbu procjene utjecaja zahvata na okoli\u0161.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Istra\u017eiva\u010dki radovi \u0107e se provoditi u vremenskom periodu od 19 mjeseci, a uklju\u010duju geoistra\u017eivanja, utvr\u0111ivanje hidrolo\u0161kih i hidrogeolo\u0161kih karakteristika lokacije te provo\u0111enje ograni\u010denih terenskih istra\u017eivanja vezano za stanje flore i faune, \u0161umske ekosustave te kori\u0161tenje poljoprivrednog zemlji\u0161ta u neposrednoj okolici lokacije. U sklopu istra\u017eiva\u010dkih radova provodit \u0107e se sljede\u0107e aktivnosti:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>analiza fotogrametrijskih aerosnimaka, <\/li><li>satelitskih snimaka te odgovaraju\u0107e kartografske dokumentacije;<\/li><li>field research;<\/li><li>geoelectric sounding;<\/li><li>seismic reflection and refraction;<\/li><li>electrical tomographic measurements;<\/li><li>near-site georadar surveys;<\/li><li>water permeability testing in drill holes;<\/li><li>petrological and geomechanical rock analyses;<\/li><li>tracing;<\/li><li>geochemical analyses of drilled rocks and groundwater.<\/li><\/ul>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">The research results will provide basis for a study report unifying all research findings. The study report will aim to accurately and concisely highlight the most important findings from every research discipline and provide main conclusions based on these results and their role in planning and evaluating the site for future Centre construction. All research findings will be published and made publicly available.<\/p>","protected":false},"excerpt":{"rendered":"<p>Ugovor za uslugu provedbe istra\u017eiva\u010dkih radova na planiranoj lokaciji Centra za zbrinjavanje radioaktivnog otpada na podru\u010dju \u010cerkezovca potpisan je 25. sije\u010dnja 2021. godine sa zajednicom ponuditelja koju \u010dine Geotehni\u010dki studio d.o.o., Geodetski fakultet Sveu\u010dili\u0161ta u Zagrebu i Rudarsko-geolo\u0161ko-naftni fakultet Sveu\u010dili\u0161ta u Zagrebu. Ugovor je potpisan po provedenom postupku javne nabave za Izradu dokumentacije i provedbu [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":5718,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"wpai_generated_summary":"","iawp_total_views":9,"wpai_meta_description":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-5717","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-vijesti"],"_links":{"self":[{"href":"https:\/\/www.fond-nek.hr\/en\/wp-json\/wp\/v2\/posts\/5717","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.fond-nek.hr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.fond-nek.hr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.fond-nek.hr\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.fond-nek.hr\/en\/wp-json\/wp\/v2\/comments?post=5717"}],"version-history":[{"count":0,"href":"https:\/\/www.fond-nek.hr\/en\/wp-json\/wp\/v2\/posts\/5717\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.fond-nek.hr\/en\/wp-json\/wp\/v2\/media\/5718"}],"wp:attachment":[{"href":"https:\/\/www.fond-nek.hr\/en\/wp-json\/wp\/v2\/media?parent=5717"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.fond-nek.hr\/en\/wp-json\/wp\/v2\/categories?post=5717"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.fond-nek.hr\/en\/wp-json\/wp\/v2\/tags?post=5717"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}